Joined: 2010.11.16
Project: Reconstruction
Location: Guangdong
Owners of units / Owner: Jiaoling County Dragon Cement rotary kiln
Stages of progress: environmental assessment
Project Name: Guangdong Jiaoling County oil pit kiln cement Dragon Enterprise Group Co., Ltd. 4500t / d cement clinker production lines and technical renovation project of cogeneration 9MW
Project Overview: The project site is located in the oil pit Jiaoling County Management District Dipu Town Village, construction of 4500t / d clinker and cement production line technological transformation project 9MW waste heat power generation, environmental impact assessment unit of the Guangzhou Municipal Environmental Protection Engineering Design Institute Limited. Tel :0753 -7,798,488
Address: Guangdong Province, Meizhou City, County, State Road 205 Jiaoling
Project: Reconstruction
Location: Guangdong
Owners of units / Owner: Jiaoling County Dragon Cement rotary kiln
Stages of progress: environmental assessment
Project Name: Guangdong Jiaoling County oil pit kiln cement Dragon Enterprise Group Co., Ltd. 4500t / d cement clinker production lines and technical renovation project of cogeneration 9MW
Project Overview: The project site is located in the oil pit Jiaoling County Management District Dipu Town Village, construction of 4500t / d clinker and cement production line technological transformation project 9MW waste heat power generation, environmental impact assessment unit of the Guangzhou Municipal Environmental Protection Engineering Design Institute Limited. Tel :0753 -7,798,488
Address: Guangdong Province, Meizhou City, County, State Road 205 Jiaoling
Project Summary Joined: 2010.11.01
Nature: New
Area: Xinjiang
The scale of investment: 495,062,460 yuan
Owners of units / Owner: Pine State Power New Energy Co., Ltd. Turpan
Progress stage: project approval
The project is new construction, the current stage of project approval, is expected in December 2010 the tender for the construction unit, the unit can be of interest to contact us in advance with the owner in order to obtain opportunities for cooperation.
Project Name: Xinjiang Turpan river cascade hydropower stations along the canal head works the following
Project Overview: The project overview: engineering the steps are run-of-power stations, using both linked to the layout, power generation, the final tail water ditch into the teeth through the drought Seoul are Zi reservoir. Projects have been built using water power headworks, canal head power station cited the normal water level of sluice 1468.76m. Canal head sluice main power station, grit chamber, power generation, water diversion tunnel, penstock, powerhouse, tailrace etc.; other cascade hydropower stations mainly by the pressure of the former pool, bypass valve, power generation, water diversion tunnel, penstock, powerhouse, tailrace and so on. The total installed capacity of the river cascade hydropower stations along the river 42.85kW, power plant to ensure output 14.9MW, the annual average generating capacity of 227 million kW / h. Cascade hydropower project along the river a total investment of 495,062,460 yuan, the small size of the project 1 type5 and other projects.
China Bidding Website Editor's note: This project will involve the turbine generator set, automatic control, pumps and equipment, valve type of equipment, instruments, transformers and so on.
Contact Information Contact: Xia Fengming
Tel: 15299303004
Address: 390 # Turpan Oasis Road, 6th Floor, Industrial and Commercial Bank
Nature: New
Area: Xinjiang
The scale of investment: 495,062,460 yuan
Owners of units / Owner: Pine State Power New Energy Co., Ltd. Turpan
Progress stage: project approval
The project is new construction, the current stage of project approval, is expected in December 2010 the tender for the construction unit, the unit can be of interest to contact us in advance with the owner in order to obtain opportunities for cooperation.
Project Name: Xinjiang Turpan river cascade hydropower stations along the canal head works the following
Project Overview: The project overview: engineering the steps are run-of-power stations, using both linked to the layout, power generation, the final tail water ditch into the teeth through the drought Seoul are Zi reservoir. Projects have been built using water power headworks, canal head power station cited the normal water level of sluice 1468.76m. Canal head sluice main power station, grit chamber, power generation, water diversion tunnel, penstock, powerhouse, tailrace etc.; other cascade hydropower stations mainly by the pressure of the former pool, bypass valve, power generation, water diversion tunnel, penstock, powerhouse, tailrace and so on. The total installed capacity of the river cascade hydropower stations along the river 42.85kW, power plant to ensure output 14.9MW, the annual average generating capacity of 227 million kW / h. Cascade hydropower project along the river a total investment of 495,062,460 yuan, the small size of the project 1 type5 and other projects.
China Bidding Website Editor's note: This project will involve the turbine generator set, automatic control, pumps and equipment, valve type of equipment, instruments, transformers and so on.
Contact Information Contact: Xia Fengming
Tel: 15299303004
Address: 390 # Turpan Oasis Road, 6th Floor, Industrial and Commercial Bank
Project Owner
Shijiazhuang West District northwest part water conservancy flood protection Ecology Project Headquarters
Total Investment
RMB 40 million
Project process
operation prepaing
Project Period
2008- 2008
Telephone
0086-311-87712539/87712763
Address
North second rings of Shijiazhuang City, Hebei Province
Requirements or Project Description
Shijiazhuang West District northwest part water conservancy flood protection Ecology (the second stage) sewage treatment factory project, the project鈥檚 located in the northwest part, West District, Shijiazhuang City, Hebei Province, is the auxiliary project for Shijiazhuang West District northwest part water conservancy flood protection Ecology Project, treats 40,000 t/d of sewage.
The total investment of project is 40 million yuan.
Shijiazhuang West District northwest part water conservancy flood protection Ecology Project Headquarters
Total Investment
RMB 40 million
Project process
operation prepaing
Project Period
2008- 2008
Telephone
0086-311-87712539/87712763
Address
North second rings of Shijiazhuang City, Hebei Province
Requirements or Project Description
Shijiazhuang West District northwest part water conservancy flood protection Ecology (the second stage) sewage treatment factory project, the project鈥檚 located in the northwest part, West District, Shijiazhuang City, Hebei Province, is the auxiliary project for Shijiazhuang West District northwest part water conservancy flood protection Ecology Project, treats 40,000 t/d of sewage.
The total investment of project is 40 million yuan.
Project Owner
Shanxi energy coal-seam gas investment charges share Ltd.
Total Investment
RMB 245,650,000
Project process
under designed
Project Period
2007- 2008
Telephone
0086-351-7037552
Address
F4, C area, No.2 building of digital harbor, South Middle-ring Street, country High-new District, Taiyuan City, Shanxi Province
Requirements or Project Description
Coal-seam Gas Development and Utilization Project, is located in coal field area, Qin Shui County, Jin Cheng City, Shanxi Province, which is jointly invested by Shanxi energy estate Corp. limited liability company and China petroleum North-China oil-field branch company, Shanxi energy coal-seam gas investment charges share Ltd. for being in charge of construction, the main mark is two parts that are exploited and diffluenting of coal-seam gas. The total investment of project is 1,445,650,000 yuan.
The project is Diffluence part project, the annual output of diffluence coal-seam gas 200,000 tons, the total investment of project is 245,650,000 yuan.
Shanxi energy coal-seam gas investment charges share Ltd.
Total Investment
RMB 245,650,000
Project process
under designed
Project Period
2007- 2008
Telephone
0086-351-7037552
Address
F4, C area, No.2 building of digital harbor, South Middle-ring Street, country High-new District, Taiyuan City, Shanxi Province
Requirements or Project Description
Coal-seam Gas Development and Utilization Project, is located in coal field area, Qin Shui County, Jin Cheng City, Shanxi Province, which is jointly invested by Shanxi energy estate Corp. limited liability company and China petroleum North-China oil-field branch company, Shanxi energy coal-seam gas investment charges share Ltd. for being in charge of construction, the main mark is two parts that are exploited and diffluenting of coal-seam gas. The total investment of project is 1,445,650,000 yuan.
The project is Diffluence part project, the annual output of diffluence coal-seam gas 200,000 tons, the total investment of project is 245,650,000 yuan.



2010/11/16 10:32 | by 